Alvanchi, A, Lee, S and AbouRizk, S (2012) Dynamics of Working Hours in Construction. Journal of Construction Engineering and Management, 138(01), 66–77.

Bakhoum, E S and Brown, D C (2012) Developed Sustainable Scoring System for Structural Materials Evaluation. Journal of Construction Engineering and Management, 138(01), 110–9.

Bemelmans, J, Voordijk, H, Vos, B and Buter, J (2012) Assessing Buyer-Supplier Relationship Management: Multiple Case-Study in the Dutch Construction Industry. Journal of Construction Engineering and Management, 138(01), 163–76.

Bo, X and Chan, A P C (2012) Investigation of Barriers to Entry into the Design-Build Market in the People’s Republic of China. Journal of Construction Engineering and Management, 138(01), 120–7.

El-Diraby, T E (2012) Epistemology of Construction Informatics. Journal of Construction Engineering and Management, 138(01), 53–65.

Han, S, Lee, S and Peña-Mora, F (2012) Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects. Journal of Construction Engineering and Management, 138(01), 98–109.

Jarkas, A M (2012) Buildability Factors Influencing Concreting Labor Productivity. Journal of Construction Engineering and Management, 138(01), 89–97.

  • Type: Journal Article
  • Keywords: Labor; Productivity; Concrete construction; Reinforcing steel; Buildability; Labor productivity; Efficiency; Pumped concrete; Skipped concrete; Concrete volume; Height; Reinforcing steel congestion ratio; Workability; Categorical-regression;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000404
  • Abstract:
    Improving labor productivity of in situ reinforced concrete construction is necessary because of the importance of this material to the industry. Several factors influence labor productivity, but buildability is among the most important. Despite the plethora of research into construction productivity reported over the years, a thorough examination of the literature revealed a dearth of research into the effects of buildability factors on the efficiency of the concreting operation. Because concreting is an integral, labor intensive, trade of in situ reinforced concrete construction, the objective of this research is to explore the influence of primary buildability factors on concreting labor productivity. In achieving this objective, a sufficiently large volume of productivity data was collected and analyzed by using the categorical-regression method. As a result, the effects and relative influence of: (1) concrete workability; (2) reinforcing steel congestion; (3) volume of pours; and (4) height relative to ground level, on labor productivity of skipped and pumped placement methods are determined and quantified. The findings show significant impacts of factors investigated on the efficiency of the concreting operation, which can provide designers with feedback on how well their designs consider the requirements of the buildability concept, and the tangible consequences of their decisions on the productivity of the operatives. Practical recommendations, moreover, are presented, which upon implementations, may improve the buildability level of this trade, thus translate into higher labor productivity and lower labor cost. On the other hand, the depicted patterns of results can provide guidance to construction managers for effective planning and efficient labor and plant utilization.

Ji, S, Park, M and Lee, H (2012) Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea. Journal of Construction Engineering and Management, 138(01), 43–52.

Kim, B and Hong, T (2012) Revised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction. Journal of Construction Engineering and Management, 138(01), 154–62.

Leung, M and Chan, I Y S (2012) Exploring Stressors of Hong Kong Expatriate Construction Professionals in Mainland China: Focus Group Study. Journal of Construction Engineering and Management, 138(01), 78–88.

Lhee, S C, Issa, R R A and Flood, I (2012) Prediction of Financial Contingency for Asphalt Resurfacing Projects using Artificial Neural Networks. Journal of Construction Engineering and Management, 138(01), 22–30.

Shrestha, P P, O’Connor, J T and Gibson, G E (2012) Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. Journal of Construction Engineering and Management, 138(01), 1–13.

Song, X, Peña-Mora, F, Menassa, C C and Arboleda, C A (2012) Insurance as a Risk Management Tool for ADR Implementation in Construction Disputes. Journal of Construction Engineering and Management, 138(01), 14–21.

Taghaddos, H, AbouRizk, S, Mohamed, Y and Hermann, U (2012) Simulation-Based Auction Protocol for Resource Scheduling Problems. Journal of Construction Engineering and Management, 138(01), 31–42.

Yang, H, Chan, A P C, Yeung, J F Y and Li, Q (2012) Concentration Effect on Construction Firms: Tests of Resource Partitioning Theory in Jiangsu Province (China) from 1989 to 2007. Journal of Construction Engineering and Management, 138(01), 144–53.

Yu, W and Wang, K (2012) Best Value or Lowest Bid? A Quantitative Perspective. Journal of Construction Engineering and Management, 138(01), 128–34.

Zerjav, V, Hartmann, T and Javernick-Will, A (2012) Internal Governance of Design and Engineering: The Case of the Multinational Firm. Journal of Construction Engineering and Management, 138(01), 135–43.